Interdisciplinary Science and Technology 1
Building Information
Interdisciplinary Science and Technology Building I provides flexible laboratories with adjoining workspace for bioengineering; neural engineering; and molecular, tissue and cell engineering research to develop artificial organs, biomaterials, and diagnostic and therapeutic devices. One laboratory explores smart implant devices that locate and stimulate specific brain regions helping impaired individuals power robotic arms or alleviate seizures in Parkinson’s patients.
Campus Location: | Tempe |
Gross Square Footage: | 193,294 |
Total Project Cost: | $74,000,000 |
LEED: | Gold |
Architect: | Perkins + Will / Dick & Fritsche Design Group |
Construction Team: | Gilbane |
Project Start Date: | July 2004 |
Project End Date: | February 2006 |
Solar Information
Campus: Tempe |
Number of Inverters: 1 |
Address: 550 E. Orange Street, Tempe, AZ 85287 |
Inverter Rating: 50 kWac |
Peak DC Output: 57 kWdc |
Inverter Model: PV Powered |
Commissioned Date: 10/2011 |
Inverter Manufacturer: Advanced Energy Industries, Inc. |
Number of Panels: 238 |
Racking System: SunLink Corporation |
Panel Size: 240 Wdc |
System Type: 20-degree Ballasted |
Panel Model: KD240GX-LPB(ZT) |
System Designer/Installer: Ameresco Southwest, Inc. |
Panel Type: Polycrystalline |
System Owner: NRG Energy, Inc. |
Panel Manufacturer: Kyocera Solar, Inc. |
Contract Type: Qualified Management Agreement |
REC Incentive: $0.09/kWh (APS) |
Total Project Cost: $290,810 |