Building Information
The Polytechnic Campus Sun Devil Fitness Complex was constructed in direct response to student demand and input. The building is a two-story, sustainable structure, certified by the United States Green Building Council to a LEED (Leadership in Energy and Environmental Design) gold designation. Included in this facility are two soccer fields and a softball field, and 10,000 square feet of state-of-the-art weight and fitness areas, including cardiovascular equipment, strength machine equipment, and free weights. The complex also boasts three multipurpose studios for aerobics, boot camp, yoga, dance, Pilates, and student club use; a two-court gymnasium for basketball, volleyball, and badminton; a multi-activity gymnasium for campus events, conferences, concerts, and indoor soccer; two racquetball courts; expanded Health Services; and an outdoor leisure pool with lap lanes. Programs and services are open during the day, evening and weekends. Read more at ASU News.
Campus: | Polytechnic |
Gross Square Footage: | 72,181 |
Total Project Cost: | $ 25,590,000 |
Architect: | Architekton |
Construction Team: | Gilbane |
Project Start Date: | December 2011 |
Project End Date: | January 2013 |
LEED Certification: | Gold |
Solar Information
20,682
(kWh)
Annual Production FY 2021
57
(kWh)
Average Daily Production FY 2021
$211
(dollars in thousands)
Total Project Cost
Campus: Polytechnic |
Manifold System: Sunda Seido |
Address: 7332 S. Sun Devil Mall, Mesa, AZ 85212 |
System Type: Solar Thermal - Fixed |
Peak DC Output: 105 kWdc equivalent |
System Designer: Architekton/360 Architects, Inc. |
Annual Production FY 2021: 20,682 kWh equivalent |
System Installer: TDIndustries |
Average Daily Production FY 2021: 57 kWh equivalent |
System Owner: Arizona State University |
Commissioned Date: 1/2013 |
Contract Type: n/a |
Number of Evacuated Tubes: 384 |
REC Incentive: n/a |
Evacuated Tube Type: Seido 1-16 |
Total Project Cost: $211,000 |
Module Manufacturer: Beijing Sunda Solar Energy Technology Co, Ltd. |
|