Phase 1 - East side and Southwest section
1,628,189
(kWh)
Annual Production FY 2021
4,449
(kWh)
Average Daily Production FY 2021
20.96%
Capacity Factor FY 2021
$7.43
(dollars in millions)
Total Project Cost
Phase 2 - Northwest section
448,127
(kWh)
Annual Production FY 2021
1,224
(kWh)
Average Daily Production FY 2021
19.77%
Capacity Factor FY 2021
$1.64
(dollars in millions)
Total Project Cost
Campus: Tempe |
Racking System: Custom steel structure |
Address: 1100 S. Rural Road, Tempe, AZ 85287 |
System Type: 20-degree Fixed |
Inverter Manufacturer: Advanced Energy Industries, Inc. |
|
Phase 1 - East side & Southwest section | Phase 2 - Northwest section |
---|---|
Shaded Parking Spaces: 440 shaded parking spaces on top deck |
Shaded Parking Spaces: 104 shaded parking spaces on top deck |
Peak DC Output: 885 kWdc |
Peak DC Output: 258 kWdc |
Annual Production FY 2021: 1,628,189 kWh |
Annual Production FY 2021: 448,127 kWh |
Actual Annual Production FY 2021: 4,449 kWh |
Average Daily Production FY 2021: 1,224 kWh |
Capacity Factor FY 2021: 20.96% |
Capacity Factor FY 2021: 19.77% |
Commissioned Date: 10/2010 |
Commissioned Date: 8/2014 |
Number of Panels: 3,276 |
Number of Panels: 860 |
Panel Size: 270 Wdc |
Panel Size: 300 Wdc |
Panel Model: 270Vd |
Panel Model: JC300M-24/Ab |
Panel Type: Polycrystalline |
Panel Type: Polycrystalline |
Panel Manufacturer: Suntech Power Holdings Co., Ltd. |
Panel Manufacturer: ReneSola Ltd. |
Number of Inverters: 3 |
Number of Inverters: 2 |
Inverter Rating: 260 kWac |
Inverter Rating: 100 kWac |
Inverter Model: PV Powered |
Inverter Model: AE100TX |
System Designer/Installer: Ameresco Southwest, Inc. |
System Designer/Installer: Ameresco, Inc. |
System Owner: NRG Energy, Inc. |
System Owner: SunEdison Origination3, LLC |
Contract Type: Qualified Management Agreement |
Contract Type: Power Purchase Agreement |
REC Incentive: $0.18/kWh (APS) |
REC Incentive: $0.07/kWh (APS) |
Total Project Cost: $7,426,816 |
Total Project Cost: $1,642,410 |