Music Building
135,772
(kWh)
Annual Production FY 2021
371
(kWh)
Average Daily Production FY 2021
16.43%
Capacity Factor FY 2021
$473
(dollars in thousands)
Total Project Cost
Campus: Tempe |
Number of Inverters: 1 |
Address: 50 E. Gammage Pkwy, Tempe, AZ 85287 |
Inverter Rating: 75 kWac |
Peak DC Output: 94.08 kWdc |
Inverter Model: PV Powered |
Annual Production FY 2021: 135,772 kWh |
Inverter Manufacturer: Advanced Energy Industries, Inc. |
Average Daily Production FY 2021: 371 kWh |
Racking System: SunLink Corporation |
Capacity Factor FY 2021: 16.43% |
System Type: 20-degree Ballasted |
Commissioned Date: 8/2011 |
System Designer/Installer: Ameresco Southwest, Inc. |
Number of Panels: 392 |
System Owner: NRG Energy, Inc. |
Panel Size: 240 Wdc |
Contract Type: Qualified Management Agreement |
Panel Model: KD240GX-LPB(ZT) |
REC Incentive: $0.1225/kWh (APS) |
Panel Type: Polycrystalline |
Total Project Cost: $473,349 |
Panel Manufacturer: Kyocera Solar, Inc. |