North Section (approx. 3.01 acres)
1,056,932
(kWh)
Annual Production FY 2021
2,888
(kWh)
Average Daily Production FY 2021
23.80%
Capacity Factor FY 2021
$5.84
(dollars in millions)
Total Project Cost
South Section (approx. 2.32 acres)
617,687
(kWh)
Annual Production FY 2021
1,688
(kWh)
Average Daily Production FY 2021
23.78%
(kWh)
Capacity Factor FY 2021
$1.79
(dollars in millions)
Total Project Cost
The following information is the same for each site. |
|
---|---|
Campus: Polytechnic |
Inverter Manufacturer: Advanced Energy Industries, Inc. |
Commissioned Date: 4/2012 |
Racking System: Custom ground mount |
Panel size: 280 Wdc |
System Type: Single-Axis Tracker |
Panel Model: Reliathon 280 |
System Designer/Installer: Ameresco, Inc. |
Panel Type: Polycrystalline |
System Owner: NRG Energy, Inc. |
Panel Manufacturer: Suntech Power Holdings Co., Ltd. |
Contract Type: Solar Equipment Lease Agreement |
Inverter Model: Solaron |
North Section |
South Section |
---|---|
Address: 6231 S. Lennox Ave, Mesa, AZ 85212 |
Address: 6980 E. Union Ave., Mesa, AZ 85212 |
Peak DC Output: 505.68 kWdc |
Peak DC Output: 295.68 kWdc |
Annual Production FY 2021: 1,035,613 kWh |
Annual Production FY 2021: 557,307 kWh |
Average Daily Production FY 2021: 2,837 kWh |
Average Daily Production FY 2021: 1,527 kWh |
Capacity Factor FY 2021: 29.231% |
Capacity Factor FY 2021: 26.90% |
Number of Panels: 1,824 |
Number of Panels: 1,056 |
Number of Inverters: 1 |
Number of Inverters: 1 |
Inverter Rating: 500 kWac |
Inverter Rating: 250 kWac |
Panel Manufacturer: Suntech Power Holdings Co., Ltd. |
Panel Manufacturer: Suntech Power Holdings Co., Ltd. |
|
|
REC Incentive: $0.105/kWh (SRP) |
REC Incentive: $0.214/kWh (SRP) |
Total Project Cost: $5,835,440 |
Total Project Cost: $1,792,313 |