Business and Finance.

For Design & Construction Professionals

blueprints

For Design & Construction Professionals

Project Guidelines (Now in effect - replaces previous Design Guidelines)

Project Guidelines

Project Guidelines are in effect as of 06/06/13. They apply to the Arizona Center for Law and Society and to all other projects beginning on or after 06/06/13. The Project Guidelines and other documents below replace the Design Guidelines document previously used by ASU. All questions and communications regarding the project, the user group or the university, must be routed through the ASU Project Manager(s).

PDF

Project Guidelines Addenda  - Design professionals and contractors shall incorporate addenda listed below with dates prior to the project contract date.

ADDENDUM A: 32 84 23 SPRINKLER IRRIGATION SYSTEMS - Addendum A replaces the corresponding section contained in the current Project Guidelines. It applies to the Arizona Center for Law and Society and to all other projects beginning on or after 09/23/13.

 

PDF
Accessibility Standards PDF
Classroom Design Standards PDF
Electrical Reliability PDF
Engineering Design Guidelines PDF
FDM Variance Request Form PDF
Signage Guidelines PDF
Site Improvement Design Guidelines PDF
Solar Alternative Energy Design PDF
Sustainable Design Guidelines PDF